Full Home Refurbishment in London & Hertfordshire

A whole-house refurbishment touches every trade you can name — structure, heating, power, plumbing, joinery, finishes. We hold all of it under one team, so there is one programme, one point of contact and nobody to blame but us.

Scope

What a full refurbishment covers

Every house is different, but a whole-house project usually runs through most of this list. We scope it properly before we price it, so the number you get is the number you pay.

  • Strip-out, waste management and temporary works
  • Structural alterations — RSJs, openings, chimney breast removals, underpinning where needed
  • Full or partial rewire, consumer unit, lighting design and data
  • Heating replacement — boiler, radiators or underfloor, zoned controls
  • Plumbing, soil stacks, mains upgrades and water treatment
  • Windows, doors, roofing and external fabric repairs
  • Insulation, plastering, screeds and floor build-ups
  • Kitchens, bathrooms and bespoke joinery
  • Decoration, flooring and final finishes
  • Building control sign-off and handover certificates
How we work

One team, every trade

Most refurbishment problems are not build problems. They are coordination problems — the electrician who first-fixed before the joiner set out, the plumber who ran a pipe through a joist the structural engineer needed intact, the boiler commissioned three weeks after the plasterer wanted the heating on.

Alico runs heat, electric and build as one team rather than three subcontractors with three programmes. Services are set out together before first fix, the structural sequence drives the trades rather than following them, and the person who priced the job is the person on site.

It is a quieter way to build. It also means when something is discovered behind a wall — and on a period property something always is — there is one team on site to re-sequence around it rather than four diaries to reconcile.

Compliance

Regulations, certification and sign-off

A refurbishment that isn't certified isn't finished. These are the approvals a whole-house project typically needs, and who signs each one off.

Gas & heating
Gas Safe registered engineers. Boiler installation and commissioning certificates issued on completion and notified to Building Control.
Electrical
Installation certified to BS 7671 and notified under Part P. You receive the Electrical Installation Certificate and the consumer unit schedule.
Structural
Beam and foundation design by a chartered structural engineer, with calculations submitted to Building Control before work starts.
Building Regulations
Full plans or building notice application, staged inspections through the build, and a completion certificate at handover.
Party Wall etc. Act 1996
Where works affect a shared wall or are within three metres of a neighbouring foundation, notices are served and awards agreed before we start.
Insurance
Full public liability cover in place for the duration of the works.
Budget

What drives the cost and the programme

We don't publish a price per square metre, because the honest answer is that two houses on the same street can differ by a factor of three. What we can tell you is what moves the number.

  • Structure. Removing walls, forming openings or underpinning adds engineering, temporary works and time before any finish is touched.
  • Services condition. A house that needs a full rewire, a new boiler and a mains upgrade carries significantly more first-fix cost than one that needs a refresh.
  • Specification. Sanitaryware, joinery, stone and ironmongery span a very wide range, and this is usually where a budget is won or lost.
  • Access and storage. Central London terraces with no off-street parking and restricted delivery windows cost more to run than a detached house with a driveway.
  • Occupied or empty. Working around a family in residence is slower and needs more protection than an empty property.
  • Consents. Listed building consent, conservation area constraints or a party wall award all add lead time before work can start.
Programme

How a refurbishment runs

  1. Site visit and scope

    We walk the property with you, take levels and photographs, and establish what you actually want from the finished house before anyone talks about price.

  2. Detailed quote

    A written, itemised quote against a defined scope — not a headline figure. Where a cost genuinely can't be fixed yet, it's flagged as a provisional sum rather than buried.

  3. Design, engineering and consents

    Structural calculations, Building Control application, party wall notices and any planning or listed building consent, coordinated before mobilisation.

  4. Strip-out and structure

    Enabling works, temporary support, structural alterations and fabric repairs. The messiest phase and the one that governs everything after it.

  5. First fix

    Heating, electrical and plumbing routes set out together, then installed. Inspected before anything is closed up.

  6. Second fix and finishes

    Plaster, joinery, kitchens, bathrooms, decoration and flooring, in the sequence that protects the finishes already installed.

  7. Commissioning and handover

    Systems commissioned, certificates issued, snagging closed out, and a walkthrough of how the house now works.

Good to Know

Home Refurbishment — common questions

For a typical London house, allow 12–24 weeks on site once work starts, and add lead time before that for design, structural calculations, Building Control and any party wall awards. Structural work, listed building consent or a difficult access position will extend it. We give you a realistic programme with the quote rather than an optimistic one.

Sometimes, on a phased project where we can isolate a floor and keep a working kitchen and bathroom. For a whole-house refurbishment involving a rewire and heating replacement it is usually neither comfortable nor faster, and we'll say so. We'd rather tell you before you commit than halfway through.

Both. If you already have an architect we'll price and build to their information and coordinate with them through the job. If you don't, we work with structural engineers and designers we trust and can bring them in — you're not obliged to appoint a design team before you talk to us.

On a period property, you generally will — a failed lintel, buried services, previous work that was never certified. We tell you as soon as we find it, price the remedy against the original scope, and get your agreement before proceeding. Nothing goes on the final account that you haven't seen coming.

Yes. We make the Building Regulations application, book the staged inspections, and issue the gas, electrical and structural certificates at handover. You end the project with the paperwork you'll need when you come to sell.

Browse all FAQs
Start your project

Request a quote for your project

Answer a few quick questions and the team will be in touch shortly.

Request a Quote≈ 60 sec
Step 1 of 617%

What type of project are you planning?

Takes about 60 seconds
WhatsAppCall Now